2007 - Energy Australia - Kooragang STS

The project involved the civil and building work for the construction of the new 132/33kV Kooragang Sub-Transmission Substation for Energy Australia. The work includes the following:

  • Bulk Excavation and Imported Fill
  • Drainage and Site Roadworks
  • Construction of a Control Building
  • Building Work
  • Fencing
  • Electrical Work
  • Fitout of the new Building

Drilling timber piles for control building.

Pouring slab for control building.

Pouring slab for control building.

Steel fixers working on transformer bund.

Poured transformer bund.

Cable trenches from one transformer to the control building.

Two runs of 200mm plastic welded feeder conduits.

Lifting precast wall panels into place.

Precast walls in place with steel beams ready for roof planks.

Installation of precast hollowcore roof planks.

Roof planks installed and wall bracing still in place.

Inside the control room with false floor and cable tray.

Completed control building

Electrical switchgear installed (By Energy Australia) prior to yard rock installation