2007 - Energy Australia - Kooragang STS
The project involved the civil and building work for the construction of the new 132/33kV Kooragang Sub-Transmission Substation for Energy Australia. The work includes the following:
- Bulk Excavation and Imported Fill
- Drainage and Site Roadworks
- Construction of a Control Building
- Building Work
- Fencing
- Electrical Work
- Fitout of the new Building
|

Drilling timber piles for control building.
|

Pouring slab for control building.
|
|

Pouring slab for control building.
|

Steel fixers working on transformer bund.
|
|

Poured transformer bund.
|

Cable trenches from one transformer to the control building.
|
|

Two runs of 200mm plastic welded feeder conduits.
|

Lifting precast wall panels into place.
|
|

Precast walls in place with steel beams ready for roof planks.
|

Installation of precast hollowcore roof planks.
|
|

Roof planks installed and wall bracing still in place.
|

Inside the control room with false floor and cable tray.
|
|

Completed control building
|

Electrical switchgear installed (By Energy Australia) prior to yard rock installation
|