2005 - Transgrid - Armidale 132/66kV Transformer Replacement

Civil works involved the replacement of two 66/132kV Transformers at Armidale Substation including:

  • Transformer 1 and Transfromer 2 Runway Slab
  • Oil Containment and Drainage
  • Rebuild Cable Trench
  • Footings
  • Transformer 1 and Transformer 2 Compounds
  • Structural Steel Structures
  • Earthing

The above three images show the substation prior to our works. We then constructed a new transformer bund in the space between the two existing and once this was operational we removed the first (left) transformer bund and built a new one in its place before removing the now redundant one on the right.

Footings opposite the new transformer 2 bund.

New transformer 2 bund formwork.

Transformer 2 bund pour.