2005 - Transgrid - Armidale 132/66kV Transformer Replacement
Civil works involved the replacement of two 66/132kV Transformers at Armidale Substation including:
- Transformer 1 and Transfromer 2 Runway Slab
- Oil Containment and Drainage
- Rebuild Cable Trench
- Footings
- Transformer 1 and Transformer 2 Compounds
- Structural Steel Structures
- Earthing
The above three images show the substation prior to our works. We then constructed a new transformer bund in the space between the two existing and once this was operational we removed the first (left) transformer bund and built a new one in its place before removing the now redundant one on the right.
|

Footings opposite the new transformer 2 bund.
|

New transformer 2 bund formwork.
|
|

Transformer 2 bund pour.
|
|
| |
|
| |
|